Common safety requirements for the closed Leuna chemical site
A large number of legally independent companies that own real estate on the Leuna chemical site (site companies) have settled on the externally closed chemical site.
In addition to these site companies, there are also companies operating on the Leuna chemical site that have rented or leased land or buildings or are contractors of companies.
Clear rules for occupational and plant safety ensure high safety standards throughout the site. These rules were jointly agreed by the site companies and laid down in site agreements. They are binding for all companies operating on the site and implement applicable safety and accident prevention regulations.
All persons entering, driving on or working on the site must comply with the rules laid down in the site agreements.
The following can be viewed in the download area:
- the site agreements applicable to all site companies, their contractors and tenants,
- a presentation of the most important instructions for entering and driving on the site,
- the SHE instructions 21.501 “Construction and maintenance measures” and 21.502 “Dismantling and demolition work/clearance status”, which apply specifically to contractors of the InfraLeuna Group.
Individual companies also have company-specific rules, which can be obtained from the respective company.
Site agreements
Here you will find an overview of the site agreements for the Leuna chemical site. These are valid for the entire site. For contractors of the InfraLeuna Group, SGU 21.501 “Construction and maintenance measures” and SGU 21.502 “Dismantling and demolition work/clearing status” also apply.
Notes for contractors of the InfraLeuna Group
The site agreements are implemented internally at InfraLeuna by means of identical SHE instructions. The correspondences to be observed are as follows:
1.1 Alarm regulations for the leuna chemical site
Number of the SGU Instruction: 21.001
German • PDF • 0.28 MB
2.1 Work permit
Number of the SGU Instruction: 21.101
German • PDF • 0.2 MB
2.2 Entering containers and confined spaces
Number of the SGU Instruction: 21.102
German • PDF • 0.04 MB
2.3 Cable systems – work on cable routes
Number of the SGU Instruction: 21.103
German • • 0 MB
2.4 Pipe bridge regulations of the leuna chemical site
Number of the SGU Instruction: 21.104
German • PDF • 0.25 MB
2.5 Regulations for welding and firing work
Number of the SGU Instruction: 21.105
German • PDF • 0.06 MB
2.6 Earthworks
Number of the SGU Instruction: 21.106
German • PDF • 0.11 MB
2.8 Safety regulations for external companies/contractors
Number of the SGU Instruction: 21.108
German • PDF • 2.39 MB
2.10 Plant road traffic regulations
Number of the SGU Instruction: 21.110
German • PDF • 0.16 MB
2.11 Track systems
Number of the SGU Instruction: 21.111
German • PDF • 0.21 MB
2.14 Fire protection regulation
Number of the SGU Instruction: 21.114
German • PDF • 0.24 MB
2.15 Explosion protection
Number of the SGU Instruction: 21.115
German • PDF • 0.15 MB
3.3 Procedure for issuing licenses fort he construction of facilities/buildings in the vocinity of railway tracks
Number of the SGU Instruction: 21.202
German • PDF • 0.03 MB
3.5 Transport of dangerous goods
Number of the SGU Instruction: 21.204
German • PDF • 0.26 MB
3.6 Entering and treavelling on the leuna chemical site
Number of the SGU Instruction: 21.205
German • PDF • 0.11 MB
3.7 Allocation of construction numbers
Number of the SGU Instruction: 21.206
German • PDF • 0.36 MB
3.8 Utilisation of unmanned aerial systems (ULS)
German • PDF • 0.3 MB
5.1 Construction and maintance measures
Number of the SGU Instruction: 21.501
German • PDF • 1.8 MB
5.2 Dismantling and demolition work/clearance status
Number of the SGU Instruction: 21.502
German • PDF • 0.63 MB
Safety rules at the chemical site
The following generally applicable safety rules have been defined to ensure accident-free co-operation.
German • PDF • 2.29 MB